(NAR) VOL. IV NO. 2 / JANUARY - APRIL 1993
DPWH RATES OF FEES AND CHARGES FOR SUBSURFACE EXPLORATION | |||
Kind of Test/Service Proposed of DPWH | Existing Rates New DPWH Rate | ||
1. Mobilization | — | P3,000.00 | |
2. Demobilization | — | 3,000.00 | |
3. Mobilization and Demobilization | P2,930.00 | ||
4. Drilling through | — | ||
a) Ordinary Soil, per Linear Meter — 500.00 | |||
b) Gravel/Rocks, using NQ bit, per Linear Meter | — | 1,000.00 | |
5. Hole to Hole Transfer, per move | — | 1,000.00 | |
6. | Rental of equipment including water pump Fuel and Oil, per day | — | 1,410.00 |