HERNANDO, J.:
[Petitioner] Eduardo Atienza was engaged in the business of operating MV Ace I, a passenger vessel plying the Batangas-Mindoro route. [Respondent] Golden Ram Engineering Supplies and Equipment Corporation [GRESEC] is a dealer and distributor of engines and heavy equipment. Its President and Manager is [respondent] BartoLome T. Torres.
Asserting his claim for damages arising from breach of warranty. Atienza filed a Complaint, averring, inter alia, that Torres offered for sale two vessel engines amounting to P3.5 Million Pesos to be installed in MV Ace I, described as follows:TWO (2) MAN Diesel Engines, Type D 2840 LE, rated at 470 Hp each, continuous output "A" at 1800 rpm, complete with 2 x ZF (Zahnradfabrik Friedrichshafen AG) Reversed/Reduction Gear Type BW 161 4.06:1 standard ration in accordance with the attached Technical Specification and Scope of Supply.
On 24 August 1993, Atienza bought the two vessel engines from [GRESEC] and as proof of his purchase, he was issued a Proforma Invoice which stated therein the warranty period, viz:WARRANTY PERIOD OF THE EQUIPMENT:
The warranty period is given in accordance with the General Conditions of Sale DK.0105.N-12-87, article XI, herewith attached, for a period of 12 months, reckoned from date of commissioning, but not longer than 18 months after notification of readiness for delivery ex-warehouse Manila. The warranty period is farther limited to 2000 hours of operation.
Atienza forthwith paid the amount of P2.5 Million Pesos, after which the two engines were delivered and commissioned by [GRESEC] sometime in March 1994.
On 26 September 1994, the engine on the right side of MV Ace I suffered a major dysfunction, the diagnosis of which revealed that the connecting rod had split resulting in engine stuck up. Atienza immediately reported the incident to [GRESEC] which sent a certain Engineer R. R. Torres (Engr. Torres), its Sales and Service Engineer, to inspect and determine the extent of the damage. Engr. Torres confirmed that the "defect was inherent being attributable to factory defect". This finding was reported to MAN B&W Diesel, Singapore Pte. Ltd. (MAN Diesel), the foreign supplier. In turn, the latter promised that the engine which suffered the malfunction would be replaced in accordance with the warranty.
Thereafter, Atienza made pleas for the replacement of the engine but his entreaties fell on deaf ears. Inevitably, he suffered losses for failure to operate since 26 September 1994. On 28 October 1994, Atienza wrote [GRESEC] a Demand Letter offering two alternatives for the company – one, replace the engine or reimburse him for the losses he had incurred, or two, retrieve the two engines and refund the cost with interest plus payment for losses. However, [GRESEC] paid no heed to his demand prompting him to lodge a Complaint for damages.
In their Answer, [GRESEC] and Torres (collectively, defendants) admitted the breakdown of the engine but confuted Atienza's assertion that Engr. Torres had confirmed that "defect was inherent being attributable to factory defect". Contrariwise, they claimed that the cause of the damage to the engine was improper maintenance on the part of Atienza. Defendants maintained that they never promised to replace the engine and that MAN Diesel was liable only for replacement of parts found to be defective on account of unsound material, faulty design or poor workmanship. Inasmuch as the defect of the engine was brought about by improper maintenance, the warranty claim must necessarily be denied as it was not within the coverage thereof. Moreover, [GRESEC] was merely an agent of MAN Diesel which had the authority to grant or deny warranty claims. [Defendants] likewise professed that Atienza had quoted portions of Article XI (Warranty Clause) of the General Conditions to support his claim; yet, he conveniently omitted other provisions which would nullify his claim, In particular, they cited Item 5 which states –
5. No warranty shall be accepted by MAN if damage is due to:
x x x x
- Purchaser failing to comply with handling, maintenance and service instructions for goods (e.g. operation instructions)."[5]
The Pro-forma invoice provides that the conditions and the period of the warranty is as follows:WARRANTY PERIOD OF EQUIPMENT
The warranty period is given in accordance with the General Conditions of Sale DK.0105.N-12-87, article XI, herewith attached, for a period of 12 months, reckoned from date of commissioning, but not longer than 18 months after notification of readiness for delivery ex-warehouse Manila. The warranty period is further limited to 2000 hours of operation.
XI. WARRANTY
1. MAN's warranty covers the property explicitly guaranteed. Where parts are to be found defective on account of unsound material, faulty design or poor workmanship, MAN, shall at its option, repair or replace on an ex-factory basis, free of charge, all parts of its delivery which in consequence of such deficiencies are found to be unfit to use or seriously affected in use.
The warranty is to the exclusion of all other claims. All parts replaced shall become the property of MAN. For repair work and parts replaced MAN offers the same warranty as for the original goods in respect of bought-out items used by MAN in the manufacture of goods without any appreciable onward processing. MAN's liability shall be limited to assigning its warranty claims on the supplier. Bought-out items come under MAN's warranty insofar as MAN is responsible for the selection of the correct type and size of item. If elimination of a defect by MAN is unreasonable, the Purchaser or a third party may with the consent of MAN eliminate said defect expertly himself. In such cases, MAN shall reimburse the costs by not more than the amount that MAN would have incurred had MAN itself eliminated the fault.
x x x x
2. MAN's warranty commences on the day the commissioning ends and ends after 12 months. The warranty shall expire in all cases not later than 18 months after shipment or notification of readiness for dispatch.
x x x x
5. No warranty shall be accepted by MAN if damage is due to:
x x x x
- the Purchaser failing to comply with handling, maintenance and service instructions for goods (e.g. operation instructions)
It is not controverted that the starboard engine broke down six months from time it was commissioned. This means that it was well within the 12-month period under the warranty. Raymond Torres testified on cross-examination that the starboard engine had not reached 2,000 hours at the time of breakdown of the engine and it was also within the period of 12 months from the time of commissioning (tsn, pp. 22-23, dated September 10, 1996).
From the time the starboard engine was commissioned it had performed differently from that of the portside engine. According to [Atienza] who was present during the sea trial in Manila Bay on February 13, 1994 it was [respondent] Bartolome Torres and [Engr.] Raymond Torres who effected the start of the vessel and [Atienza] observed that the right side of engine was [not functioning properly]. When asked what is the matter with the right engine (sic). Bartolome Torres and [Engr.] Raymond Torres said that it only lacks adjustment. On the trip from Manila to Batangas. the right engine was still slow in acceleration. But they were told to just use the engine for two weeks. The right engine emitted black smoke (tsn, dated February 23, 1999). They again informed Bartolome Torres and [Engr.] Raymond Torres who fixed the engine while the vessel MV Ace I was docked in Batangas City. The black smoke disappeared but the acceleration was still the same.
After one week, the right engine again emitted black smoke. [Atienza] again informed Bartolome Torres who said that they will change the piston ring. [Atienza] was concerned why anything had to be replaced in the new engine. After repair, the black smoke disappeared but the acceleration of the engine was still slow.
The right engine again emitted black smoke after three weeks. [Atienza] was advised by defendants to change the propeller because its heavy and big. However. when a brand new propeller was used there was no remarkable change. It was only for one month that the black smoke did not appear.
[Atienza] did not receive any written report about the repairs that were done on the starboard engine. It was their understanding that it was Bartolome Torres and [Engr.] Raymond Torres who will maintain the engines, all instructions by them were being followed by Manila Ace crew (tsn, dated August 12, 1999).
When the right engine broke down, [Atienza] was verbally assured that [respondents] will replace the engine. They did not say that they will refer the matter to MAN Diesel nor did they furnish [Atienza with] a copy of the findings of MAN Singapore (tsn, dated January 27, 2000).
It is the allegation of [respondents] that MAN denied the warranty claims of [Atienza] under paragraph 5 on the ground that, "the Purchaser failed to comply with the handling, maintenance and servicing instructions for the goods."
However, [respondents] failed to substantiate their claim. It merely presented log sheets that were allegedly accomplished by the crew of MV Ace I. xxx
[Atienza], on the other hand, presented witnesses to prove that [respondents] were the ones in charge of maintaining the two engines. Arsenio Lim, operations Manager of Manila Ace, testified that they were instructed by [respondents] that when something goes wrong with the two engines, they should call Mr. Torres (tsn, dated March 14, 1996). They are not supposed to let another person touch the engine. A week after the starboard engine broke, [Engr.] Raymond Torres went to see the engine and even took pictures without even opening the engine. In front of many people [Engr.] Raymond Torres said "ok, I will change this after one week."
Rolando Casipi, oiler of Manila Ace, testified that [Engr.] Raymond Torres [told] them when to change oil and that they cannot change oil without Raymond Torres present or supervising it. He was beside the chief engineer when [Engr.] Raymond Torres told their chief engineer that if there is any trouble in the engine just call him (tsn, dated August 12, 1997).
[Atienza] testified that he received no written report about the repairs that were done and that it was their understanding that it was Bartolome Torres and [Engr.] Raymond Torres who will maintain the engines, all instructions by them were being followed by Manila Ace crew (tsn, dated August 12, 1999).
[Respondents] maintain that for [Atienza] to avail of the warranty he should submit a written complaint. This was not accomplished by [Atienza] for the reason that he always called upon Bartolome Torres and [Engr.] Raymond Torres whenever there were problems with the engine (tsn, dated April 13, 1999). [Respondents] did not require from [Atienza] a written complaint whenever they fixed the engine. [Respondents] acted in bad faith when it required a written complaint from [Atienza] after MAN Singapore had allegedly denied the claim on the warranty. They did not even inform [Atienza] that they will refer the matter to MAN Singapore.
[Respondents] also failed to explain the reason why of the two engines bought by [Atienza], which was used and maintained simultaneously, only the starboard engine suffered malfunction and eventually it broke down.[6] (Emphasis supplied)
WHEREFORE, premises considered, judgment is hereby rendered in favor of [Atienza], and [GRESEC and Bartolome] are hereby ordered IN SOLIDUM to pay [Atienza]:
1. Compensatory or actual damages in the form of unrealized income in the total amount of One Million Six Hundred Thousand Pesos (P1,600,000.00) with legal interest from date of filing of the Complaint;
2. The amount of P200,000.00 as and by way of moral damages; and
3. The amount of P150,000.00 as and by way of attorney's fees and costs of suit.[7]
[1] That show the bad faith, malice and intent to cause damage committed by Bartolome Torres as Director, Stockholder, of [GRESEC] hence his liability with the respondent corporation is IN SOLIDUM.
[2] That on account of bad faith, malice and intent to cause damage by Bartolome Torres, petitioner suffered moral damages and having been compelled to litigate to protect its rights and interest, petitioner should be awarded reasonable Attorney's Fees.
[3] When it modified the Decision of the [RTC] exculpating respondent Bartolome Torres from liability in solidum with the corporation which he wholly owns.[8]
A warranty is a statement or representation made by the seller of goods, contemporaneously and as part of the contract of sale, having reference to the character, quality or title of the goods, and by which he promises to insure that certain facts are or shall be as he represents them to be.
It is not disputed that there is no express agreement between the parties as to the coverage of the warranty. In the absence of an express stipulation between the parties, the applicable provision is paragraph 2, Article 1547 of the Civil Code which states that in a contract of sale there is an implied warranty that the thing shall be free from hidden defects. A hidden defect is one which is unknown or could not have been known to the vendee. Corollarily, Articles 1561 and 1566 of the same Code set forth the responsibility of the vendor against hidden defects:Art. 1561. The vendor shall be responsible for warranty against the hidden defects which the thing sold may have, should they render it unfit for the use for which it is intended, or should they diminish its fitness for such use to such an extent that, had the vendee been aware thereof, he would not have acquired it or would have given a lower price for it; but said vendor shall not be answerable for patent defects or those which may be visible, or for those which are not visible if the vendee Is an expert who, by reason of his trade or profession, should have known them.
Art. 1566. The vendor is responsible to the vendee for any hidden faults or defects in the thing sold, even though he was not aware thereof.
This provision shall not apply if the contrary has been stipulated, and the vendor was not aware of the hidden faults or defects in the thing sold.
x x x x
We find no persuasive reason to depart from the factual finding of the [RTC] that the engine malfunction was due to a hidden defect which was unknown to [Atienza] at the time he bought the engine x x x.
x x x x
Au contrario, there is lack of evidence to show that the engine malfunctioned due to [Atienza's] negligence in its maintenance. x x x
x x x x
Item No. (2), Section IX, Appendix I of the Pro-Forma Invoice provides that the warranty of the engine commences from the day of commissioning and ends twelve (12) months thereafter. In the Pre-Trial Order dated 5 November 1996, both parties entered into a stipulation of fact that the date the engine was commissioned was sometime In March 1994. Thus, the filing of the Complaint on 16 November 1994 is well within the warranty period.
We hold and so rule that the Pro-Forma Invoice for which [Atienza] affixed his signature is in the nature of a contract of adhesion. A contract of adhesion is defined as one in which one of the parties imposes a ready made form of contract, which the other party may accept or reject, but which the latter cannot modify. It is construed strictly against the party who drafted it or gave rise to any ambiguity therein. Being a contract of adhesion, the said provision in the Pro-Forma Invoice must be strictly construed against [respondents], the party which prepared the agreement.[9]
Had [respondents] complied with its obligation under the warranty, it can be reasonably expected that [Atienza] would have continued earning in the same manner as its previous trips, which clearly indicate that it failed to earn during the time it had to stop operations because of engine breakdown.
Because of respondents' failure to replace the unserviceable engine which resulted in cessation of operations of [Atienza's] vessel, he suffered serious anxiety, sleepless nights, social humiliation and economic dislocation. He is entitled to moral damages in the amount of P200,000.00.
[Atienza] presented evidence that because of the cessation of the operations of MV Ace I on September 26, 1994, the company failed to meet its obligations and creditors abandoned it for its failure to pay its obligations.
The breach of warranty involved in this case does not involve simple negligence on the part of [respondents]. They presented (Exh. "16"). the authorization of MAN regarding the shipment of four (4) demo units. To the mind of the Court, this is an indication that it delivered demo units instead of brand new units to [Atienza]. Coupled by the fact that from the beginning. [Atienza] has complained [of] the slow acceleration of the starboard engine, the black smoke that it emits and its breakdown. There being fraud and bad faith on the part of [respondents], the award of moral damages is proper.
Because of [respondents'] unjustifiable refusal to satisfy [Atienza's] valid claim, [Atienza] was compelled to litigate and incur expenses to protect his interest. [Atienza] was constrained to engage the services of a counsel for a fee of 20% of all amounts recovered as and for attorney's fees plus P1,000.00 as appearance fee. In his direct-examination, [Atienza] disclosed that he had already incurred half a million for his legal expenses (tsn, dated February 23, 1999). The award of P150,000.00 attorney's fee is therefore proper.[12]
Moral damages are awarded if the following elements exist in the case: (1) an injury clearly sustained by the claimant; (2) a culpable act or omission factually established; (3) a wrongful act or omission by the defendant as the proximate cause of the injury sustained by the claimant; and (4) the award of damages predicated on any of the cases stated Article 2219 of the Civil Code. In addition, the person claiming moral damages must prove the existence of bad faith by clear and convincing evidence for the law always presumes good faith. It is not enough that one merely suffered sleepless nights, mental anguish, and serious anxiety as the result of the actuations of the other party. Invariably such action must be shown to have been willfully done in bad faith or with ill motive. Bad faith, under the law, does not simply connote bad judgment or negligence. It imports a dishonest purpose or some moral obliquity and conscious doing of a wrong, a breach of a known duty through some motive or interest or ill will that partakes of the nature of fraud.[15]
(2) When the defendant's act or omission has compelled the plaintiff to litigate with third persons or to incur expenses to protect his interest;
x x x x
(5) Where the defendant acted in gross and evident bad faith in refusing to satisfy the plaintiffs plainly valid, just and demandable claim;
1. He assents (a) to a patently unlawful act of the corporation, or (b) for bad faith or gross negligence in directing its affairs, or (c) for conflict of interest, resulting in damages to the corporation, its stockholders or other persons;
2. He consents to the issuance of watered stocks or who, having knowledge thereof, does not forthwith file with the corporate secretary his written objection thereto;
3. He agrees to hold himself personally and solidarity liable with the corporation; or
4. He is made, by a specific provision of law, to personally answer for his corporate action.[19] (Emphasis supplied)